Articles

Posted on Wednesday, September 24, 2014 - 9:53am

3.7    Contamination/ cross-contamination

Posted on Wednesday, September 24, 2014 - 9:51am

3.5    Losses in feed weight

Shortages/ losses can be estimated under following sub heads:

Handling loss

Posted on Tuesday, September 23, 2014 - 4:33pm

3.3    Quality commitment  and points to evaluate

Posted on Tuesday, September 23, 2014 - 4:32pm

3.2    Determining excess or short usage of raw materials

Posted on Tuesday, September 23, 2014 - 4:29pm

3.1.9  Moisture  control operation

Posted on Tuesday, September 23, 2014 - 4:27pm

3.1.7  Pellet mill operation

Posted on Tuesday, September 23, 2014 - 4:00pm

3.1.6  Molasses mixing operation

Posted on Tuesday, September 23, 2014 - 3:57pm

3.1.5  Mixing operation-Dry

Posted on Tuesday, September 23, 2014 - 3:38pm

3.1.4  Grinding operation

Posted on Tuesday, September 23, 2014 - 3:33pm

3.1.8  Pellet cooling operation

Posted on Tuesday, September 23, 2014 - 3:31pm

3.1.10  Bagging section

Posted on Tuesday, September 23, 2014 - 3:27pm

3.1.13 Aspiration section

Posted on Tuesday, September 23, 2014 - 3:16pm

3.1.11  Bin sampling

Posted on Tuesday, September 23, 2014 - 3:15pm

3.1.12 Premix section

Posted on Tuesday, September 23, 2014 - 3:14pm

3.1.3  Batch preparation operation

Subscribe to Articles